visit

Welcome to visit us!

MENU
News Center
  1. Home
  2. methods of calculating tonnage in mining

methods of calculating tonnage in mining

The next section discusses themethodsoftonnagemeasurement at AngloGold Ashanti Iduapriem Limited (AAIL). Survey and spottonnage. The surveytonnageis determined based on the surveyor’s calculated volume and the spottonnageis compiled from a pit tally sheet.

Get Price

News List

methods of calculating tonnage in mining
methods of calculating tonnage in mining

methods of calculating tonnage in mining.Tonnage-cutoffmodel and average grade-cutoff model for a single The cutoff has great influence on the reserve and resource calculation. of constant length along exploration or mining works, the tonnage-cutoff and found to be consistent with the results obtained by the traditional geometric block method.

More Details
methods of calculating tonnage in mining
methods of calculating tonnage in mining

methods of calculating tonnage in mining.Cubical opening methoddig up a pit ofmxmxmsize and weight all the material this weight is tonnage factor for sulphide ore deposit at initial exploration this method is not applicable in case of iron ore , limestone, rock phosphate is applicable in the mining stage normally bulk density is determined by this method conventional density

More Details
Calculation of Ore Tonnage Grade from Drill hole Samples
Calculation of Ore Tonnage Grade from Drill hole Samples

Metallurgical ContentORE RESERVE CALCULATIONSMINERAL ORE RESERVE Case 1MINERAL ORE RESERVE Case 2MINERAL ORE RESERVE Case 3 The usualmethodof sampling mineral deposits is to drill holes and assay the sludge or core. Though the results thus obtained may not represent the true average value of the deposit, it is on these results that estimates of practically all large orebodies are …

More Details
sampling ore and calculating tonnage
sampling ore and calculating tonnage

methodsofcalculating tonnage in mining.Calculationof OreTonnageGrade from Drill hole Samples The results of carrying out thismethodthrough a complete orebody of a largetonnageseem to justify the labor involved therein—thetonnagechecks with the standardmethodto within 1.014 per cent.—the standardmethodshowed about 55 000 metrictonsless copper and the percentage by the ...

More Details
Calculation of Volume and Tonnage of Ore Deposit
Calculation of Volume and Tonnage of Ore Deposit

Abstract. For the calculation of the volume and the tonnage of ore deposits there is a variety of available methods to choose from, each suited for a particular deposit. These methods fall into two categories:reserve calculation on the basis of cross-sectionsand on the basis oflongitudinal planar sectionsor level plans respectively.

More Details
Mineral Deposit Value How to Calculate the Potential
Mineral Deposit Value How to Calculate the Potential

4 Steps in Calculating the Mineral Deposit Value 1.Calculate the Tonnage ofthe Mineral Deposit. 2.Multiply the Tonnage by the Grade.3.Convert Copper to Pounds and Gold to Ounces.To find out how I come up with the numbers 2,204.62262 and 34.2857 I... 4. Convert the Pounds and Ounces to the ...

More Details
Calculating Tonnage Of
Calculating Tonnage Of

methods of calculating tonnage in mining« equipment for quarry Grade andTonnagefor British Columbia Mineral Deposit Models The use of the compiled grade andtonnagedata forms the …

More Details
Cut off grade estimation QueensMineDesignWiki
Cut off grade estimation QueensMineDesignWiki

Calculatingthe Cut-Off Grade Break-Even and Internal. The most simplistic way to determine cut-off grade is through the break-even and internalmethod. Thismethodis easy to use and involves minimal background information. It is preferred as a first estimate, and is most effective in the early planning phases of a project.

More Details
Calculation of Volume and Tonnageof Ore Deposit
Calculation of Volume and Tonnageof Ore Deposit

For thecalculationof the volume and thetonnageof ore deposits there is a variety of availablemethodsto choose from, each suited for a particular deposit. Thesemethodsfall into two categories: reservecalculationon the basis of cross-sections and on the basis …

More Details
Methodsforcalculatingthe minimum amortizationtonnage
Methodsforcalculatingthe minimum amortizationtonnage

Therefore, amortizationtonnagecan be expressed as a function ofminingrate. The amortizationtonnageis calculated for a series ofminingrates, one of which will indicate a minimumtonnage. Part II describes a procedure forcalculatingthe optimumminingrate to obtain maximum present value of an ore body, whenminingrate is the only variable.

More Details
MiningTerminology Hawkeye Gold Diamond Inc.
MiningTerminology Hawkeye Gold Diamond Inc.

Aminingcompany will proceed with the cost of a feasibility study generally once it has proved continuity of its ore deposits confirmed by samplings and or drilling on a relatively detailed grid that allows for fairly precise determination oftonnage, density, mineral and metal content and is that part of the orebody that economic viability ...

More Details
The Importance Of Dilution Factor For Open PitMining
The Importance Of Dilution Factor For Open PitMining

MiningProject Evaluation. ... Dilution increases the operating costs in the mill by increasing thetonnageof material to be milled. By better understanding the root causes of the dilution, quanitiying it, and planning accordingly, it can be controlled and reduced. Knowledge Centre.

More Details
Coal Calculations Mining SGS
Coal Calculations Mining SGS

These calculations are used tocalculatevarious skeleton parameters including ash and calorific value that let you determine the grades of your coal. Read more SGS global teams of chemists and experts use a range of coal analytical calculations and indexes to arrive at the calorific values, total hydrogen, Coke Reactivity Index (CRI) and Coke ...

More Details
(PDF)Optimization of shovel truck system for surface mining
(PDF)Optimization of shovel truck system for surface mining

Path Optimum truck fleetsizeWaiting time(min) Utilization of shovel Productiontons/min Unit cost cents/tonAt shovel At waste S11-W5 3 2.48 0.54 0.781 22.137 20.91 **

More Details
Converting cubicvolumetotonnage OnlineConversion Forums
Converting cubicvolumetotonnage OnlineConversion Forums

Re: Converting cubicvolumetotonnageWhen you saytonnage, is that registerton? Ortonas in weight? Registertonis a unit ofvolumeequal to 100 cubic feet, about 2.8316 cubic meters. 12.096 / 2.8316 = 27 registertonAs the registertonis a unit ofvolumethen it would be the same for any substance.

More Details
Types of DrillingMethodsusedin Mining Boring Mining
Types of DrillingMethodsusedin Mining Boring Mining

ADVERTISEMENTS: In this article we will discuss about the types of drillingmethodsusedin mining. The types are: 1. Percussive Drilling 2. Rotary Drilling.Method# 1. Percussive Drilling: In thismethodwhich is the oldest one of drilling, the hole is drilled by striking a number at short in intervals on the rock […]

More Details
The Platinum Group Element Deposits of the Bushveld
The Platinum Group Element Deposits of the Bushveld

Bestmining methodsthen also become an issue. Currently, allminingon the Platreef is by open pitmethods, but it is limited to probably 500–800 m depth. Drilling has shown that the Platreef continues to at least 2 km depth.Methodsof undergroundminingof this wide ore body are still being developed.

More Details
Machine Hours Rate Formula andCalculation(With
Machine Hours Rate Formula andCalculation(With

ADVERTISEMENTS: Machine Hours Rate: Formula,Calculation, Problems and Solutions! The machine hour rate is similar to the labour hour ratemethodand is used where the work is performed primarily on machines. Formula: The formula used in computing the rate is: ADVERTISEMENTS: Factory overhead/Machine hours If factory overhead is Rs 3, 00,000 and total machine […]

More Details
Understanding Cut Off Grade 4(Tonnage,Grade, and Costs
Understanding Cut Off Grade 4(Tonnage,Grade, and Costs

Feb 17, 2018· In my First Article, I discussed howcalculatingcut-offgradeis essentially a way of making sure that there is enough value in the material to be mined to cover its cost of extraction (mining...

More Details
Tonnage Calculator Oxford Sand Gravel Limited
Tonnage Calculator Oxford Sand Gravel Limited

TheTonnage Calculatorhelps you to estimate the amount of aggregate required for your job. Please note that densities will vary somewhat between different loads, but the default values assigned for the various aggregates are good standard "rules of thumb" for estimating. Step 1: Choose metric or imperial as your form of measurement. ...

More Details
Abstract USGS
Abstract USGS

MINE LIFE. Given a known ore reservetonnage, the life and daily capacity for a typicalminingoperation can be determined. Taylor developed an equation commonly used in prefeasibility studies to determine mine life, known as Taylor's rule (equation 3). Based on this rule, the basic equation for C (capacity of ore production in st/d) is:

More Details
4 CoalMiningand Processing Coal Research and
4 CoalMiningand Processing Coal Research and

The cost pertonofminingcoal by surfacemethodsis generally lower than that by undergroundmethods. In the United States, in addition to a continuous growth in coal production since the 1960s, there has been a dramatic shift in production from undergroundminingto surfacemining( Figure 1.6 ).

More Details
Particle Analysis in Mining and Minerals HORIBA
Particle Analysis in Mining and Minerals HORIBA

Many of the particles encounteredin miningare characterized by sieves (classifiers). Recent advances in computers, cameras, and software make image analysis practical for samples with sizes larger than several microns in diameter. As particlesizedecreases, sieving and/or dynamic image analysis becomes more arduous or impossible and laser diffraction becomes the technique of choice.

More Details
How toCalculate Cut and Fillfor Earthworks Projects
How toCalculate Cut and Fillfor Earthworks Projects

Sep 06, 2017· The thirdmethodthat is commonly used tocalculateearthworks volumes is the triangular prismsmethod. This is by far the most technically difficultmethod, but is also the most accurate. Thismethodstarts by triangulating the existing terrain. This involves joining the points in the terrain to create a continuous surface of connected triangles.

More Details
Mining Underground mining Britannica
Mining Underground mining Britannica

Mining-Mining - Underground mining: When any ore body lies a considerable distance below the surface, the amount of waste that has to be removed in order to uncover the ore through surfaceminingbecomes prohibitive, and underground techniques must be considered. Counting against undergroundminingare the costs, which, for eachtonof material mined, are much higher underground than on the ...

More Details
Appendix E Coal Miningand ProcessingMethods Coal
Appendix E Coal Miningand ProcessingMethods Coal

In surfacemining, the ground covering the coal seam (the overburden) is first removed to expose the coal seam for extraction. The elements of a surfaceminingoperation are (1) topsoil removal and storage for later use, (2) drilling and blasting the strata overlying the coal seam, (3) loading and transporting this fragmented overburden material (called spoil), (4) drilling and blasting the ...

More Details
Grade and tonnage model of Placer Au PGE
Grade and tonnage model of Placer Au PGE

Thesemethodsinclude panning, sluicing, hydraulicmining, and dredging. Draglines were used to mine some placers. Cut-off grades are also dependent on the value of gold during the period, or periods, of operation. Some placer deposits were excluded due to grade ortonnagefigures not compatible with the majority of placers found in the model.

More Details
Design an AppropriateMining Methodfor Extraction of Ore
Design an AppropriateMining Methodfor Extraction of Ore

May 01, 2016· The bestMining method(Single level caving) was then subjected to cost analysis to establish its viability. The total cost calculated for the project was $ 2,990,869.92 and the expected revenue is $ 4,782,590.77 giving a payback period for the investment of approximately 6 months. ... The estimated totaltonnagebetween 300ml and 400ml is 1.1 ...

More Details

Are You Looking for A Consultant?

ONLINE SERVICE
totop
Click avatar to contact us